Jackets are placed on steel pipe piles driven into the seabed, with a concrete base laid over the top to construct a pier. This photograph shows the components known as jackets.
The temporary assembly of a bridge connecting shore to ship. It is temporarily assembled at the factory, then disassembled so that it can be transported over land (truck) and carried to the final site.
This is a box-shaped unit that floats on the water, fixed in place using anchors, etc., and is connected to the shore by a crossing pier. This photograph shows the completed installation on site.
Completed tugboat (a boat that pushes and pulls large ships when they approach and leave shore) propeller repairs.
Barge with a pipe-supporting bridge for transporting fluids (water, oil, etc.).